Mostrar el registro sencillo del ítem
Instalaciones del Túnel de La Oroteanda del Tren del Sur de Tenerife
dc.contributor.advisor | Coll Barbuzano, Ginés Fernando | |
dc.contributor.author | Gutiérrez Díaz, Laura | |
dc.contributor.other | Grado En Ingeniería Electrónica Industrial Y Automática | |
dc.date.accessioned | 2019-10-16T12:50:37Z | |
dc.date.available | 2019-10-16T12:50:37Z | |
dc.date.issued | 2019 | |
dc.identifier.uri | http://riull.ull.es/xmlui/handle/915/16540 | |
dc.description.abstract | The construction of the Tenerife South Train railway infrastructures is divided into several Sections and has different tunnels and viaducts. This Project is carried out for the service installations of the Tunnel Section Las Chafiras - La Oroteanda. In compliance with regulatory guidance, the installations designed are: Low-Voltage electrical installation: power supply, wiring and electrical switchgear. Tunnel ventilation system with Jet fans. Fire protection installation. Lighting installation. There is a technical building, for the operation of the electromechanical installations, with exclusive use for maintenance workers which is located in one of the tunnel entrances, and designed for the energy supply and the water supply for fire-fighting systems. | en |
dc.format.mimetype | application/pdf | |
dc.language.iso | es | |
dc.rights | Licencia Creative Commons (Reconocimiento-No comercial-Sin obras derivadas 4.0 Internacional) | |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-nd/4.0/deed.es_ES | |
dc.title | Instalaciones del Túnel de La Oroteanda del Tren del Sur de Tenerife | |
dc.type | info:eu-repo/semantics/bachelorThesis | |
dc.subject.keyword | Túnel de La Oroteanda | |
dc.subject.keyword | Tren del Sur de Tenerife |