Mostrar el registro sencillo del ítem
Mantenimiento preventivo, predictivo y correctivo dentro del fast-ferry Bocayna Express.
dc.contributor.advisor | Adrián de Ganzo, María del Cristo | |
dc.contributor.author | Rodríguez Hernández, Adrián | |
dc.date.accessioned | 2021-03-18T08:35:12Z | |
dc.date.available | 2021-03-18T08:35:12Z | |
dc.date.issued | 2021 | |
dc.identifier.uri | http://riull.ull.es/xmlui/handle/915/22491 | |
dc.description.abstract | El presente trabajo, trata de mostrar los distintos tipos de mantenimientos que se llevan a cabo en el Fast-Ferry Bocayna Express, dentro de todos los equipos con los que cuenta el buque objetivo de este trabajo. El Bocayna Express, opera en Canarias desde 2003, hace la línea que une el puerto de Corralejo (Fuerteventura) con Playa Blanca (Lanzarote) en aproximadamente 25 minutos. En la primera parte de este trabajo se hace una pequeña revisión a la historia los motores PAXMAN, desde la llegada de los motores objetivo de este proyecto hasta sus primeros motores. La segunda parte de este proyecto hace referencia a los distintos mantenimientos que se llevan a cabo, haciendo hincapié en el preventivo y predictivo de los motores principales y las reductoras de los mismos, conociendo también el mantenimiento correctivo que se lleva a cabo, mediante la exposición de averías que hayan tenido lugar. Para la elaboración del trabajo se han consultado manuales, planes de mantenimiento como MPM (Marine Plan Maintance), así como también me ha servido la experiencia adquirida durante mi período de embarque como alumno de mantenimiento nocturno. | |
dc.description.abstract | The present work, tries to show the different types of maintenance that are carried out in the Fast-Ferry Bocayna Express, within all the equipment with which the target vessel of this work counts. The Bocayna Express, operates in the Canary Islands since 2003, makes the journey that connects the port of Corralejo (Fuerteventura) with Playa Blanca (Lanzarote) in approximately 25 minutes. In the first part of this work a small revision to the PAXMAN engines history is made, from the arrival of the engines of this project to its first engines. The second part of this project refers to the different maintenance carried out, emphasizing the preventive and predictive of the main engines and their reduction, knowing also the corrective maintenance that is carried out, through the exhibition of breakdowns that have taken place. For the elaboration of the work, manuals, maintenance plans such as MPM (Marine Plan Maintance) have been consulted, as well as the experience acquired during my boarding period as a night maintenance student. | en |
dc.format.mimetype | application/pdf | |
dc.language.iso | es | |
dc.rights | Licencia Creative Commons (Reconocimiento-No comercial-Sin obras derivadas 4.0 Internacional) | |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-nd/4.0/deed.es_ES | |
dc.title | Mantenimiento preventivo, predictivo y correctivo dentro del fast-ferry Bocayna Express. | |
dc.type | info:eu-repo/semantics/bachelorThesis | |
dc.subject.keyword | Fast-Ferry Bocayna Express | |
dc.subject.keyword | Máquinas marinas |