Mostrar el registro sencillo del ítem
Semana laboral de 4 días: viabilidad empresarial o utopía
dc.contributor.advisor | Hernández Hernández, Francisco Gabriel | |
dc.contributor.author | Frias Suarez, Naiara | |
dc.contributor.author | Abreu González, Astrid Carolina De | |
dc.contributor.other | Grado En Administración Y Dirección De Empresas | |
dc.date.accessioned | 2023-09-12T21:06:47Z | |
dc.date.available | 2023-09-12T21:06:47Z | |
dc.date.issued | 2023 | |
dc.identifier.uri | http://riull.ull.es/xmlui/handle/915/33546 | |
dc.description.abstract | La reducción de la jornada laboral a 32 horas semanales es una realidad cada vez más latente. Algunos países se han adelantado a esta utopía realizando proyectos piloto en empresas de diferentes sectores, hasta demostrar que un aumento de la productividad podría sostener el trabajar 4 días a la semana. La metodología empleada ha combinado del tipo cualitativa y cuantitativa, siendo estructurada y de secuencia lógica. El objetivo principal es estudiar la viabilidad de la reducción en España, teniendo en consideración los niveles de productividad a nivel macroeconómico de países vecinos, para posteriormente extrapolar los resultados de sus estudios. Asimismo, se respaldarán dichos datos mediante un análisis microeconómico de las Cuentas Anuales de algunas empresas pioneras españolas, analizando productividades y rentabilidades económicas. Se concluye que es viable la implantación de la reducción de jornada si se garantiza un aumento de la productividad, pero con matices según el sector de actividad. | es |
dc.description.abstract | The reduction of the working day to 32 hours per week is an increasingly latent reality. Some countries have anticipated this utopia by carrying out pilot projects in companies in different sectors, to demonstrate that an increase in productivity could sustain working 4 days a week. The methodology to be followed has combined qualitative and quantitative type, being structured and logical sequence. The main objective is to study the feasibility of the reduction in Spain, considering the levels of productivity at the macroeconomic level of neighboring countries, to subsequently extrapolate results of their studies. Likewise, these data will be supported by a microeconomic analysis of the Annual Accounts of some pioneering Spanish companies, analyzing productivity and economic profitability. It is concluded that the implementation of the reduction of working hours is viable if an increase in productivity is guaranteed but with nuances according to the sector of activity. | en |
dc.format.mimetype | application/pdf | |
dc.language.iso | es | |
dc.rights | Licencia Creative Commons (Reconocimiento-No comercial-Sin obras derivadas 4.0 Internacional) | |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-nd/4.0/deed.es_ES | |
dc.title | Semana laboral de 4 días: viabilidad empresarial o utopía | |
dc.type | info:eu-repo/semantics/bachelorThesis | |
dc.subject.keyword | jornada de cuatro días | es |
dc.subject.keyword | productividad | es |
dc.subject.keyword | rentabilidad económica | es |
dc.subject.keyword | España | es |