Mostrar el registro sencillo del ítem

dc.contributor.advisorMesa Cruz, Ricardo 
dc.contributor.advisorRegalado Rodríguez, Nuria 
dc.contributor.authorBarbero Dorta, Patricia
dc.contributor.otherMáster Universitario en Ingeniería Industrial
dc.date.accessioned2024-02-29T08:38:19Z
dc.date.available2024-02-29T08:38:19Z
dc.date.issued2024
dc.identifier.urihttp://riull.ull.es/xmlui/handle/915/36754
dc.description.abstractEl siguiente Trabajo de Fin de Máster (TFM) consiste en el estudio de viabilidad técnica, ambiental y económica de una planta de tratamiento de residuos de construcción y demolición (RCD) en la isla de Tenerife, así como el anteproyecto de la misma. A lo largo del TFM se recogen conceptos teóricos con los cuales se pretende contextualizar la situación actual de la gestión y el tratamiento de residuos, como puede ser el estudio teórico del proceso de tratamiento de RCD o el estudio del mercado al que pertenece la planta. Asimismo, se plantean diferentes alternativas de diseño para la planta de tratamiento, y se concluye con la elección del diseño a implementar para comenzar con su estudio de viabilidad. A continuación, se realiza el estudio de viabilidad. La viabilidad técnica se analiza en función del emplazamiento, la capacidad, el proceso productivo, la maquinaria, las actividades y la distribución de la planta de tratamiento. El estudio ambiental determina si el impacto ambiental de la planta de tratamiento cumplirá con las regulaciones pertinentes en materia ambiental, además de caracterizar el emplazamiento de la planta. Por último, el estudio económico estima los costes derivados de la construcción y operación de la planta, y lo compara con los ingresos esperados derivados de la actividad para determinar si incurre en beneficios económicos. Se realiza, para finalizar, el anteproyecto de la planta de tratamiento de RCD objeto de estudio. En él, se analizan algunos conceptos tales como los objetivos del proyecto, los antecedentes del mismo, la planificación temporal o la evaluación de riesgos. En definitiva, el objetivo general del proyecto es el planteamiento de una planta de tratamiento de residuos de construcción y demolición que permita revalorizar los residuos derivados de obras y construcciones en la isla de Tenerife, con el fin de reducir los residuos no aprovechados y sacar beneficio económico de los mismos.es_ES
dc.description.abstractThe following Master’s Degree Final Project (MDFP), consists of the technical, environmental and economic feasibility study of a construction and demolition waste (CDW) treatment plant on Tenerife Island, as well as the preliminary project thereof. Throughout the MDFP, theoretical concepts are collected with which it is intended to contextualize the current situation of waste management and treatment, such as the theoretical study of the CDW treatment process or the study of the market to which the plant belongs. Likewise, different design alternatives are proposed for the treatment plant, and we conclude with the choice of a design to implement in order to start the feasibility study. Then, the feasibility study is carried out. The technical feasibility is analysed according to the location, capacity, production process, machines, activities and distribution of the treatment plant. The environmental study determines whether the environmental impact of the treatment plant will fulfill the relevant environmental regulations, in addition to characterizing the location of the plant. Finally, the economic study estimates the costs arising from the construction and operation of the plant, and compares it with the expected revenues derived from the activity to determine whether it incurs economic benefits. Finally, the preliminary project of the CDW treatment plant under study is carried out. It discusses concepts such as project objectives, project background, time planning or risk assessment. Ultimately, the general objective of the project is the design of a construction and demolition waste treatment plant that allows to revalue the waste derived from works and constructions on Tenerife Island, in order to reduce untapped waste and to derive economic benefit from iten
dc.format.mimetypeapplication/pdf
dc.language.isoes
dc.rightsinfo:eu-repo/semantics/openAccess
dc.rightsLicencia Creative Commons (Reconocimiento-No comercial-Sin obras derivadas 4.0 Internacional)
dc.rights.urihttps://creativecommons.org/licenses/by-nc-nd/4.0/deed.es_ES
dc.titleEstudio de viabilidad y Anteproyecto de una planta de tratamiento de residuos de construcción y demolición (RCD)
dc.typeinfo:eu-repo/semantics/masterThesis
dc.subject.keywordTreatment plant, construction and demolition waste, recycled aggregates, valorization, feasibility studyen
dc.subject.keywordPlanta de tratamiento, residuos de construcción y demolición, áridos reciclados, valorización, estudio de viabilidad.es_ES


Ficheros en el ítem

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess