Diseño de centro de transformación de MT/BT e instalación eléctrica para complejo residencial
Fecha
2021Resumen
This project will carry out the design and calculation of a transformation center, to go from
medium voltage to low voltage. This transformation center will oversee supplying electricity to all the
facilities of the residential complex.
And, the residential complex will have 59 houses with high electrification, common areas
where there is a swimming pool and a playground, and a private garage with the capacity to
accommodate 120 cars.
The residential complex is in the south of the island of Tenerife, specifically in the municipality
of Güimar, on “Avenida Paseo de Las Palmeras, 6” (see location on plans 1 and 2 of the plan drawings
document).
In addition, this project will power electric vehicles. More specifically, this project should
guarantee the electricity supply to absorb the demand from the charging points of electric vehicles
in the next 20 years. Additionally, it will be necessary to study what is the demand required by an
electric vehicle, to carry out a dimensioning in accordance with current electric vehicle charging
technologies El presente proyecto pretende realizar el diseño y cálculo de un centro de transformación,
para pasar de media tensión a baja tensión. Este centro de transformación se encargará de dar
suministro eléctrico a todas las instalaciones del complejo residencial.
Y, el complejo residencial contará con 59 viviendas de electrificación elevada, zonas de uso
común donde se encuentra una piscina y un parque infantil, y, un garaje privado con capacidad para
alojar a 120 coches.
Además, en este proyecto, aparte de dar suministro eléctrico a las zonas comunes, pretende
alimentar eléctricamente a vehículos eléctricos. Más concretamente, este proyecto deberá
garantizar el suministro eléctrico para absorber la demanda de los puntos de recarga de los vehículos
eléctricos en el periodo de los próximos 20 años.